New Construction Radon Rough-In is for properties where a new home is being built. We explain the practical options and recommend the approach that fits the building, budget, and timeline. The right radon system depends on framing stage, pipe route, and attic or exterior path.
Reasons to schedule this service

This service may be the right fit when one of these situations sounds familiar:
- a new home is being built
- a basement is being finished
- passive piping may need activation
What matters for Madison properties

Madison radon mitigation depends on Wisconsin radon risk, basement style, sump and drain tile details, crawl-space areas, and real-estate or remodel timing. For new construction radon rough-in, the estimate should account for framing stage, pipe route, and attic or exterior path, cleanup, timing, and the condition of the existing area.
What affects the estimate
- framing stage
- pipe route
- attic or exterior path
- slab prep
- future fan access
How the work usually goes

Most projects follow a simple path from review and prep through installation, cleanup, and final walkthrough.
- Test Result Review: Review the radon test result, test date, foundation layout, basement use, and any real-estate deadline.
- Foundation And Sump Check: Check slab areas, sump pits, drain tile, crawl spaces, pipe routes, fan locations, and discharge options.
- System Design Planning: Plan the mitigation system, sealing details, electrical needs, fan placement, and retest timing.
- Pipe Fan And Sealing Work: Install or repair the pipe, fan, suction point, sump cover, crawl-space barrier, or sealing work.
- Retest And Maintenance Guidance: Review manometer readings, labels, maintenance notes, and when the home should be tested again.






